Solar Power Plant Replaces Fossil Energy

Project type: Solar

Project location: Dominican Republic

Annual CO₂ reduction: 48,026 t

Installing the largest solar power plant in the Caribbean the project is an alternative to the fossil driven electricity fuel mix by sun power and furthermore creates local employment, a visitor center and a fund for social activities

264,000

pieces of solar modules installed

200

jobs during construction

500

trees recultivated

The project activity consists in the installation of a 60 Megawatt photovoltaic Solar Energy Farm in the Monte Plata province in the Dominican Republic. The expected solar irradiation per year (with 1,490 kWh/kWp) is approximately one and a half times higher than in Switzerland. 100 Giga Watt hours (equals the consumption of 20,000 households in Switzerland) electricity will be produced per year thanks to this ideal solar radiation conditions. 

It is the largest solar power plant in the Caribbean and a first of its kind in the region. It produces renewable, local produce electricity for around 50,000 households in the Dominican Republic per year. Almost 70,000 t CO2 are being reduced per year. This equals the burning of around 26 million liter fossil fuel.

The success of Monte Plata solar project increases local employment rate and raises the percentage of renewable energy for the Dominican Republic.

Dr. Quincy Lin, Chairman of GES

An assessment of environmental effects has been done. The owner is obliged to reforest outside the project area any if needed deforestation activity and to conserve an area next to a river adjacent to the project site. At least equal amount of native flora will be replanted next to the project site and also a plantation of different plant species within the boundaries of the project site is mandatory. In addition, a visitor center will be installed next to the site to demonstrate renewable energy possibilities and to provide climate education. At least five percent of the income of carbon revenue will flow in a revolving fund managed by the community of Monte Plata dedicated for social activities.

Thanks to the support of myclimate and the CO2 compensation mechanism the attractiveness of the project for investors can be improved. The project activity is financed by GES and operated by Soventix

More Pictures on Facebook

Impacts and benefits achieved so far:

  • 264,000 pieces of solar modules installed (equals 50 football pitches)
  • 200 jobs during construction
  • 50 jobs during operation
  • 5 % of incomes from carbon credits goes to local schools
  • 500 trees recultivated
  • 22,642,297 kWh renewable energy has been delivered to the grid in 2016
  • this means local produced, renewable electricity for around 50,000 households 